"I" joists
Started laying block for the garage.
Far end facing 8th Street.
Walkout.
Other end of the back.
Inside the basement.
Me on the scafolding.
This past week they finished the basement,finished the block work on the porch, parged the basement walls, dug the trench for PP&L, and put the floor joists down. This past Friday David met Jason out at the land to talk some things over. They discussed how they will cut the bank down on the one side so we have extra fill. They also went over what the plans are for the next week or so. Tomorrow, Monday they will be putting the sub floor down. Tuesday, they are setting 1st floor walls. They are being made off site. Wednesday, they are to start the sand mound. Next week is supposed to be back filling time, pouring the basement concrete floor, 2nd floor walls to go up, trusses will be set. So it's going to be taking shape pretty soon. That's about all for now!
No comments:
Post a Comment